Italian Group for Railway Technology

WORKS

The following list is a summary of the main works carried out in recent years by the Group's companies:

=== === === === ===
company of the ig4rt group:
ELETTRIFER
field of work:
Railway infrastructure
client:
RFI spa - ITALFERR spa - NODAVIA spca
purpose and scope of the work:
Carrying out the construction work for the railway High Speed crossing of Florence city, the construction work of the new High Speed railway station in Florence city centre, and all related preparatory and infrastructural works.
The works are divided into 2 lots
special features of the work:
Works partially carried out during short day or night traffic interruptions of the railway line in operation
location of the work:
Florence city junction, Tuscany, Italy
duration of the work:
Lot 1: start 24/09/2007 – work in progress
Lot 2: start 11/05/2009 – work in progress
amount of the work:
Lot 1 (amount to date 30/06/2012)
Category OS27:installations for the electrical traction€ 3.996.558,36
Category OS30:electrical and telecom installations€    772.000,00
Category OS9:installations for the electrical traction€    965.395,21
TOTAL:  € 5.733.953,57
Lot 2 (amount to date 30/06/2012)
Category OS27:installations for the electrical traction€    875.202,15
Category OG10:high/medium voltage transformation and distribution€    473.885,47
Category OS9:installations for the electrical traction€    241.993,09
TOTAL:  € 1.591.080,71
=== === === === ===
company of the ig4rt group:
ELETTRIFER
field of work:
Railway infrastructure
client:
RFI spa - ITALFERR spa - ASTALDI spa
purpose and scope of the work:
Integrated contract for executive planning and construction works for doubling the railway line Parma La Spezia between stations Solignano and Osteriazza
special features of the work:
construction works and installations in tunnel
location of the work:
Linea ferroviaria Parma La Spezia (Liguria and Emilia Romagna regions)
duration of the work:
start 04/07/2006 – work in progress
amount of the work:
Category OS29:railway superstructure€      25.000,00
Category OS27:installations for the electrical traction€ 1.356.917,77
Category OS30: electrical and telecom installations€    415.657,48
Category OS9: installations for traffic signalling€    291.388,38
TOTAL:  € 2.088.963,63
=== === === === ===
company of the ig4rt group:
ELETTRIFER
field of work:
Maintenance of railway infrastructure
client:
RFI spa
purpose and scope of the work:
Works and supplies for the maintenance of the primary lines and overhead lines electrification and electric traction, and minor works, in Florence city junction and southern lines
special features of the work:
Works carried out during short day or night traffic interruptions of the railway line in operation
location of the work:
Florence city junction and southern lines (Tuscany, Umbria and Lazio regions)
duration of the work:
start 18/03/2008 – end 08/04/2010
amount of the work:
Category OS27:installations for the electrical traction€ 7.159.612,50
Category OG10:high/medium voltage transformation and distribution€    279.947,62
TOTAL:  € 7.439.560,12
=== === === === ===
company of the ig4rt group:
ELETTRIFER
field of work:
Railway infrastructure
client:
RFI spa
purpose and scope of the work:
Works and supplies for the maintenance of the primary lines and overhead lines electrification and electric traction, and minor works, on railway lines in Tuscany
special features of the work:
Works carried out during short day or night traffic interruptions of the railway line in operation
location of the work:
Florence city junction and southern lines (Tuscany, Umbria and Lazio regions)
duration of the work:
start 02/04/2006 – end 31/03/2010
amount of the work:
Category OG10:high/medium voltage transformation and distribution€ 2.685.053,42
Category OS27:installations for the electrical traction€ 4.344.428,29
Category OS9: installations for traffic signalling€    258.979,04
Category OG11:technological systems€      74.798,39
TOTAL:  € 7.363.259,14
=== === === === ===
company of the ig4rt group:
ELETTRIFER
field of work:
Maintenance of railway infrastructure
client:
RFI spa
purpose and scope of the work:
Works and supplies for maintenance of technological systems of signaling and safety equipment, telephone and telegraph, lighting and power supply, optical
and acoustic devices on railway lines.
special features of the work:
Works carried out during short day or night traffic interruptions of the railway line in operation
location of the work:
Tuscany, Liguria and Emilia - Romagna regions
duration of the work:
start 16/06/2010 – work in progress
amount of the work:
Category OS9: installations for traffic signalling€ 1.702.392,39
Category OS27:installations for the electrical traction€    258.671,26
TOTAL:  € 1.961.063,65
=== === === === ===
company of the ig4rt group:
TM scarl & SIFIS srl
field of work:
Traffic lights
client:
Roma Servizi per la Mobilitΰ srl (Municipality of Rome)
purpose and scope of the work:
Installation, ordinary and extraordinary maintenance of centralized traffic lights plant, of Limited Traffic Zones, of variable message signs, of traffic monitoring automatic systems (Radar trap, Vistared, Tutors, Cameras), of units for traffic
and gas monitoring, of centralized traffic control room of the city of Rome
special features of the work:
First installation of road led lamps and traffic lights in Rome, first installation of warning devices for blind pedestrians, strong implementation of centralized traffic light systems in Rome with the strengthening of central control room
location of the work:
Rome, Italy
duration of the work:
Lot 1: 09/2007 – 08/2015
Lot 2: 07/2007 – 09/2014
amount of the work:
Lot 1: TOTAL:€ 13.000.000,00
Lot 2: TOTAL:€ 13.000.000,00
=== === === === ===
company of the ig4rt group:
TM scarl & SIFIS srl
field of work:
Parking system
client:
ATAC spa (Municipality of Rome)
purpose and scope of the work:
design and installation of automatic system for the control of vehicle's access to Limited Traffic Areas and to Parkings, commuters parkings controlling, 5 years maintenance
special features of the work:
first fully automated parking systems in Rome, monitored from a control room
location of the work:
18 parkings distributed in the city of Rome, plus the central control room
duration of the work:
start 12/2012 work in progress
amount of the work:
TOTAL: € 3.350.000,00 
=== === === === ===
company of the ig4rt group:
TM scarl
field of work:
Hospital technology plants
client:
Ospedale Le Molinette, Turin, Italy
purpose and scope of the work:
maintenance services and technological systems (sanitary, heating, air conditioning, medical gases)
location of the work:
Turin, Italy
duration of the work:
start 03/2013 work in progress
amount of the work:
TOTAL: € 4.300.000,00 
=== === === === ===
company of the ig4rt group:
TM scarl
field of work:
Road tunnels
client:
ANAS spa
purpose and scope of the work:
extraordinary maintenance of tunnel vault, and related ventilation systems, pollutants, lighting, fire, security, SOS
special features of the work:
including automation and diagnostics of all systems
location of the work:
Tunnel San Vito, ss50bis (BL), Italy
duration of the work:
start 07/2015 work in progress
amount of the work:
TOTAL: € 2.400.000,00 
=== === === === ===
company of the ig4rt group:
TM scarl
field of work:
Trolley bus
client:
TPER spa (Municipality of Bologna)
purpose and scope of the work:
maintenance of traction trolley line, installation of the line of traction of new trolley line, light traffic lights signs, installing new power substations
location of the work:
Bologna, Italy
duration of the work:
start 02/2013 work in progress
amount of the work:
TOTAL: € 7.500.000,00 
=== === === === ===
company of the ig4rt group:
TM scarl
field of work:
Road lighting
client:
Municipality of Palermo, Sicily
purpose and scope of the work:
Engineering Procurement and Construction for the upgrading of lighting systems and modernization of traffic lights in the city of Palermo
location of the work:
Palermo, Sicily, Italy
duration of the work:
05/2009 - 02/2012
amount of the work:
TOTAL: € 2.000.000,00 
=== === === === ===
company of the ig4rt group:
SIFIS srl
field of work:
Road tunnel
client:
Verbania Province, Northern Italy
purpose and scope of the work:
design and implementation of measures for energy conservation and energy upgrading for the gallery of Omega, including: management and monitoring of ventilation systems, fire protection, lighting, and traffic sos, via optical fiber
location of the work:
Omegna tunnel, Verbania Province, Italy
duration of the work:
09/2012 - 07/2013
amount of the work:
TOTAL: € 320.000,00 
=== === === === ===
company of the ig4rt group:
SIFIS srl, SICE snc, NICCHERI srl, ELETTRIFER srl
field of work:
Railway signalling
client:
PSC Ferroviaria spa - Italferr spa
purpose and scope of the work:
renovation of signalling, telecommunication and control systems
location of the work:
Railway stations in Rome and its province
duration of the work:
start 02/2015 - work in progress
amount of the work:
TOTAL: € 4.250.000,00 
=== === === === ===
company of the ig4rt group:
SIFIS srl, SICE snc, NICCHERI srl
field of work:
Railway signalling
client:
RFI spa
purpose and scope of the work:
Procurement, Construction and specialised Maintenance of signaling systems, telecommunications, airline, lighting, power
location of the work:
Railway stations in Florence and its province, and in Tuscany, Central Italy
duration of the work:
start 03/2015 - work in progress
amount of the work:
TOTAL: € 2.900.000,00 
=== === === === ===
company of the ig4rt group:
SIFIS srl
field of work:
Railway signalling
client:
RFI spa
purpose and scope of the work:
Procurement, Construction and Maintenance of security and signaling systems, lighting, power, optical and acoustic horns
location of the work:
Milan and province, Northern Italy
duration of the work:
start 03/2013 - work in progress
amount of the work:
TOTAL: € 2.000.000,00